This website uses cookies for statistical usage data. By continuing to use this site, you agree to the use of cookies. Don't show this again

Refurbishment of existing rainwater drainage systems

As rainfall intensities increase, many buildings are finding that the level of rainfall protection they currently experience is insufficient.

Usually this is because either modern day rainfall intensities exceed the designed level of protection or that the level of protection was under designed in relation to the building use.  

pipes

Clearflow Products ltd offer an onsite consultancy, where the existing system failure can be identified and a corrective plan put into place to upgrade / maintain the existing systems.

This gives peace of mind that the integrity of the building will be maintained.

Every refurbishment project has its own special requirements examples such as carrying out installation in live working environments, areas congested with services, poor access / egress or inadequate underground drainage.

 

All these are day to day matters which can be simply resolved by consultation with the right people.

Recent refurbishment & consultation projects

  • McVities biscuit production plant.
  • Siaca cardboard box manufacturer.
  • Sika Liquid plastics, Preston.
  • Smith & Newphew Pharmaceuticals.
  • Bluewater shopping centre.
  • Wing Yip oriental foods suppliers.
  • Ford crash test centre.
  • Bracknell shopping centre.
  • Lidl Magna Park.

To discuss your project call

0114 247 1800